For privacy, some resident information has been removed from the provided information.
Requests In Approval Process
- August 5 , 2024 – Crack sealing and seal coating asphalt driveway.
- August 5, 2024 – New roof installation.
- July 30, 2024 – Seal existing asphalt driveway.
- July 23. 2024 – Chip seal driveway.
- September 23, 2023 – Desert Purple Martin nestbox construction.
- August 11, 2022 – Roof Solar Panel Installation.
- September 17, 2021 – Shortcrete Swimming Pool – Plot Plan – Details.
- May 3, 2021 – Install a shed to hide trash containers from street view.
2024 Actions Approved/Declined
- November 23 Approved – Replace the damaged flagpole.
- October 4 Approved – Driveway resurfacing
- September 22 Approved – Stucco and paint house, upgrade mailbox.
- September 21 Approved – Replacing asphalt driveway with pavers.
- September 2 Approved – Replace chip sealed driveway with pavers.
- August 23 Approved – Add rain gutters to house exterior
- August 20 Approved – Full solar system
- August 16 Approved – Driveway repairs and seal coat.
- August 7 Approved – Crack seal coating asphalt driveway.
- July 30 Approved – Repair and reseal driveway.
- July 29 Approved – Remove and replace driveway pavers.
- July 24 Approved – Replacing asphalt driveway with pavers.
- July 9 Approved Apply a chip seal surface to the asphalt driveway.
- June 27 Approved – In-ground 15,000 gallon water harvesting cistern.
- June 12 Approved – Exterior house painting.
- May 22 Approved Replacing asphalt driveway with aggregate concrete.
- May 20 Approved Enclosed patio.
- May 14 Approved Exterior house painting.
- April 22 Approved Steel gate to enclose area adjacent to garage.
- April 23 Approved Solar panel power installation.
- March 24 Approved Paint new garage door.
- March 16 Approved Exterior house painting.
- February 19 Approved Replacing asphalt driveway with concrete.
- January 18 Approved Repainting roof with Elastomeric white coating.
- January 5- Approved Replacing driveway asphalt with concrete.
- January 3 Approved Roof mounted air condition unit.
2023 Actions Approved/Declined
- December 23 – Approved Garage Door Replacement
- December 6 – Approved Regrade Driveway
- November 25 – Approved Exterior stucco and paint
- November 24 – Approved Garage Door Replacement
- November 6 – Approved Roof mounted solar array
- October 27 – Approved Privacy Fence
- September 26 – Approved Roof mounted solar electric system
- September 21 – Approved Adding blocks to existing wall.
- September 11 – Approved Recovering front porch roof with black painted metal
- September 10 – Approved Roof mounted PV solar system
- August 25 – Approved Attached guest room
- August 11 – Approved Solar panel installation
- August 7 – Approved Reinforce river rock at driveway entrance
- July 29 – Approved Exterior painting
- June 8 – Approved Roof mounted Panasonic solar system
- May 16 – Approved Rooftop solar electric system
- May 9 – Approved Exterior painting
- May 7 – Approved Wall reconstruction and painting
- April 30 – Approved Patio screen enclosure
- April 25 – Approved Remove and replace slump block pillars at front
- April 22 – Approved Roof Mounted Solar Panels
- March 20 – Approved Rooftop solar electric system installation
- March 13 – Approved Refreshing decorative rock at front landscape
- March 5 – Approved Replace existing driveway with asphalt
- February 25 – Approved Asphalt Driveway Repair
- February 2 – Approved 5′ Stucco Wall
- January 27 – Approved Masonry Wall Screen
- January 27 – Approved Resurface Gravel Driveway
- January 11 – Approved Driveway Replacement
2022 Actions Approved/Declined
- December 22 – Approved Roof Solar Panel Installation
- November 29 – Approved Replace existing chip seal driveway with concrete pavers
- October 25 – Approved Driveway repairing and repaving
- October 25 – Approved Driveway sealing cracks and top coating
- September 21 – Approved Small pool with fence, exterior paint, landscaping
- September 20 – Approved Window Replacement
- September 6 – Approved Exterior Paint
- August 31- Approved Exterior Paint and Stucco
- August 16 – Approved Garage Door Replacement
- July 21 – Approved Solar Module Installation
- April 26 – Approved Repainting metal fence
- April 16 – Approved Rain Gutters and Water Distribution
- April 10 – Approved Detached Accessory Garage
- March 24 – Approved Artisan metal gate
- March 9 – Approved Roof mount solar installation
- March 3 – Approved Tesla solar panels on roof installation
- February 24 – Approved Shade structure at back patio
- February 4 – Approved Roof shingles replacement
- January 27 – Approved Driveway Replacement and wall
- January 24 – Approved Driveway Replacement
- January 18 – Approved Privacy Wall
2021 Actions Approved/Declined
- November 4 – Approved Paint Exterior House
- October 5 – Approved Exterior Repainting
- October 1 – Approved Backyard Ramada
- September 24 – Approved Stucco house and wall, build additional garage
- September 12 – Approved Metal Roof Installation
- August 26 – Approved New Pool Construction
- August 18 – Approved Decorative gates and wall extension
- August 10 – Approved Driveway widening
- July 16 – Approved Roof mounted solar panels with tilt
- July 3 – Approved Stucco/paint house and new garage
- June 4 – Approved Natural gas fire pit installation
- June 4 – Declined Free standing aluminum canopy frame
- May 23 – Approved Solar panel system installed on roof
- May 23 – Approved with conditions New home construction
- May 15 – Declined Painted wood fence/trellis to hid trash containers and vehicle
- May 4 – Approved with conditions Masonry wall to hide trash containers
- April 29 – Approved with conditions driveway redo, adding wall to hide various items
- April 29 – Approved with conditions Pool removal
- April 8 – Approved House Exterior Painting Project
- April 4 – Approved Converting shade structure into a garage
- March 19 – Approved with conditions Extension of RV parking pad
- March 12 – Approved Landscape side yard upgrade
- March 12 – Approved with conditions Pool Install
- March 2 – Approved with conditions Walled courtyard at front
- February 8 – Approved with conditions Rainwater harvesting cistern & new gutters
- February 10 – Approved Driveway Pavers and lights on the driveway edging
- January 6 – Approved Solar Panels